This is Barn 1 underway of first demolition. At this stage of the job we make sure all power is disconnected and isolated. We also ensure any other power that needs to stay on is connected, labelled and moved out of the demolition work zone.
At this stage we are planning and preparing out light support beams, ready for after restoration of Barn 1.
Restoration and ready for our supports to go in for all of our lighting services. At this stage we are measuring and cutting all supports needed for our automated 32 light installation.
Cabling and light installation across 16 stables within Barn 1.
2 lights for each stable, coming to a total of 32 lights across all of Barn 1.
This horse walker is located at the back of the 2 Barns that are getting a full renovation. We have supplied power for the control box, motor and lighting. A total of 6 lights have been installed on the walker.
Barn 2 is very similar to Barn 1 and also has a total of 32 lights installed. A total of 10 power points have been located around both barns as well. With a new switchboard included for the whole site.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.